DETAILED PROPERTY SEARCH
What We Do?
  • Real Estate Consulting
  • Real Estate Consulting
  • Certified guidance for buying property and investing in Turkey.
  • Check full details
  • Free Inspection Tour
  • Free Inspection Tour
  • Explore properties, regions and lifestyles with no obligation.
  • Check full details
  • Entire Buying Process
  • Entire Buying Process
  • Support with negotiations, contracts and official paperwork from start to finish.
  • Check full details
  • Residency & Citizenship
  • Residency & Citizenship
  • Assistance with Turkish citizenship by investment and residency applications.
  • Check full details

Istanbul Metro Lines To Be Launched In 2020

Istanbul Metro Lines To Be Launched In 2020 – Image 1

Get To Know More About Istanbul Metro Lines To Be Launched In 2020

The work is continuing to complete advanced stages of Istanbul metro lines in preparation for its activation and launch during the coming year 2020

Get To Know More About Istanbul Metro Lines To Be Launched In 2020

The work is continuing to complete advanced stages of Istanbul metro lines in preparation for its activation and launches during the coming year 2020. Istanbul has witnessed the inauguration of the Gebze-Halkali railway line, which includes 43 stations connecting the two sides of Istanbul and facilitating traffic between them.

Istanbul Metro Lines: Easier transportation for the big city

This huge project, which will be launched in the coming year, will have a significant impact on facilitating life in many ways. It will also play an important role in the rise in real estate prices in Istanbul and in specific areas, which is a very good investment opportunity.

Istanbul Metro Lines To Be Launched In 2020 – Image 1

While Istanbul has plenty of transportation, we also see that the Istanbul metro lines are the most important among them, for the following reasons:

  • Fast access to the metro.
  • The metro’s distance from the congestions.
  • Time accuracy in transferring between stations.
  • In addition to the Istanbul 2019 metro lines, work is underway to open the Istanbul 2020 metro stations, and the next passenger to Istanbul will be able to move through the Istanbul Metro from the airport to the place he wants along with this beautiful city.

Istanbul Metro Lines: Three lines will see the light in 2020

The construction works of three new lines planned by the Greater Istanbul Municipality to be opened in 2020, what are the new Istanbul Metro lines? Where do they pass?

Istanbul Metro Lines To Be Launched In 2020 – Image 2

1-Metro Line (Sabiha Gokcen -Tavsantepe Airport)

The first metro to be built for Sabiha Airport and the new metro line will make access to Sabiha Airport much easier than before.

The line extends 7.40 km long, and the passenger takes 11.5 minutes to pass five stations.

  • Sabiha Airport Gökçen Havalimani
  • Industrial Area – Sanayi
  • YAYALAR
  • Hospital – Hastane
  • Tavsantepe

The new line will be integrated with other metro lines as follows:

  • With the Sabiha-Tuzla airport line at Sabiha Airport Metro Station.
  • With Kaynarca Merkez – Pendik Sahil in the hospital station.
  • With (Kadiköy – Kartal – Tavsantepe line) At Tavsantepe Station.

The following is the duration of the journey from Sabiha airport to the important Istanbul points:

Note: Those who want to move from Sabiha airport to Istanbul New Airport can take a bus directly from Yenikapi or Taksim into the airport after exiting the metro station.

Istanbul Metro Lines To Be Launched In 2020 – Image 3

2- (Dudullu-Bostanci) Metro Line

  • The Dudullu-Bostanci line will extend 14, 30 km long, will take 15 minutes, and will link the Kadikoy-Atasehir-Umraniye areas.
  • This line will pass through 13 stations shown on the map
  • This line will be integrated with other metro lines as follows:
  • At the Bostanci station with the IDO and Marmaray
  • At the Kozyatag station with Kadikoy – Tavsantepe
  • At the Dudullu Station with Uskudar – Umraniye – Cekmekoy / Sancaktepe
  • At the (Mevlana) station with Altinzade – Atasehir – Sancaktepe – Sultanbeyli – Sabiha Airport.

Istanbul Metro Lines To Be Launched In 2020 – Image 4

With this line, the duration of the journey to the main areas of Istanbul will be as follows:

3-Metro line (Bogaziçi Hisarüstü Asiyan -Funicular)

It will extend only 800 meters long and the journey will be 2.5 minutes and consists of two stations as in the following picture.

Istanbul Metro Lines To Be Launched In 2020 – Image 5

Author: Maximos Real Estate